HVAC Estimation

Complete HVAC estimate for First Baptist Church gym and classroom addition. Includes ductwork, ventilation, insulation, and labor/material pricing based on plan takeoffs and local trade rates.

project details

Client: General Contractor (confidential)
Project Name: First Baptist Church – Pinehurst Gym & Classroom Addition
Location: 7373 NC Highway 211, Pinehurst, NC 28374
Prepared By: AH Estimating
Scope of Estimate: HVAC Estimating – Material Takeoff + Pricing
Included Items: Ductwork Air Handling Units & Accessories Insulation Ventilation components Tools, consumables, and related setup equipment
Estimate Type: Labor and Material Pricing with Detailed Quantity Takeoff
Date of Estimate: March 2025

Documents

Download our document to see specific data of the service and how we work.

ESTIMATE.XLXS
MARKUPS.PDF

    About Project

    The First Baptist Church – Pinehurst Gym & Classroom Addition project required a detailed HVAC estimate prepared by AH Estimating for a confidential general contractor. The scope focused on ductwork, ventilation, insulation, and air handling systems, all tailored to a multi-zone layout with unique gym and classroom mechanical needs. AH Estimating delivered a labor-and-material estimate based on detailed plan takeoffs, ensuring alignment with structural and architectural constraints.

    This estimate not only addressed core HVAC components but also accounted for tools, consumables, and setup requirements—providing a complete picture of trade costs. By applying local labor rates and supplier-informed material pricing, AH Estimating ensured the client had reliable, zone-specific HVAC costs to guide procurement, scheduling, and subcontractor negotiations.

    Key Challenges

    The HVAC estimation for the Pinehurst Church addition presented several complexities due to the building’s mixed-use design and institutional requirements. From accommodating multi-zone systems to integrating mechanical components with architectural constraints, the estimate had to address both technical accuracy and real-world constructability.

    Estimation Approach

    AH Estimating used a methodical, drawing-based approach to capture all HVAC elements in detail. The estimate was structured by system type and included current regional labor rates, material pricing, and site-specific costs to deliver a comprehensive, trade-ready proposal.

    Summary

    AH Estimating delivered a full-scope HVAC estimate for the First Baptist Church Pinehurst expansion project, including both quantity takeoff and pricing. With trade-specific labor hours, material costs, and accessory items included, the estimate supported the client in budgeting, subcontractor selection, and scheduling.

    This project reinforces AH Estimating’s capacity to manage complete HVAC estimating services—from drawing-based measurements to cost application—for institutional and faith-based projects with high documentation standards.